Road Reports
Stay informed about traffic conditions, construction updates, and temporary road closures in Chestermere. Check back regularly and follow the City’s official social media channels for the latest updates.
Report a Concern or Request a Repair
Help us keep Chestermere safe and well-maintained! Use our Report It form to submit concerns, repair requests, or service issues. Public submissions may become part of the public record. Derogatory remarks or business solicitations will not receive a response.
- To report a bylaw concern, please use our Municipal Enforcement Contact Form.
- For emergencies or safety concerns involving others, call 9-1-1 immediately.
Please Note: Road reports are subject to change without notice and are weather dependent. Always follow posted signage, obey flaggers, and drive with care.
Road Closures
| Location | Date(s) | Details | Status |
|---|---|---|---|
| Bridgeport Boulevard, between Rainbow Road and Bridgeport Grove | November 9, 2026 | Full road closure for one-day excavation and repair work. Access to Bridgeport Boulevard from Rainbow Road will be closed during construction. Motorists should follow posted detour signage. | In Progress |
| Chestermere Boulevard between Range Road 284 and Rainbow Road South (Stage 2) | Update: extended till December 05, 2026 November 5–20, 2026 | Traffic will be shifted to the south side of Chestermere Boulevard during construction. Left-turn restrictions will be in place at Dawson Drive, Merganser Drive and Range Road 284. The existing eastbound left-turn restriction onto Rainbow Road North will remain in effect. Access to properties on the north side of Chestermere Boulevard will be maintained via Dawson Drive and the access east of Merganser Drive. | In Progress |
| Rainbow Road Bridge | October 29–November 3, 2026 (weather dependent) | Bridge repair work will include curb replacement, concrete crack repairs, protective sealing and bridge rail touch-ups. The bridge will remain open, with intermittent single-lane alternating traffic controlled by flaggers. Motorists should expect minor delays and follow directions through the work zone. | In progress |
| West Chestermere Drive & Station Way | Starting September 3, 2026 | Traffic signal installation project: daytime lane restrictions and minor delays. Intersections remain open. | In Progress |
| Chestermere Boulevard from Range Road 284 to Rainbow Road S | August 7, 2026 - November 30, 2026 | UPDATE - AUGUST 20: Eastbound drivers on Chestermere Boulevard will no longer be able to turn left onto Rainbow Road North. The advanced left-turn signal will be turned off, and "No Left Turn" signage will be posted. This temporary change is being made to help reduce traffic backups at the intersection while work continues. Phase 2. Chestermere Boulevard expansion underground and surface works. The speed will be reduced to 50 km/hr and traffic control will be in place. One way entrance to Merganser Drive available (no exit). Two-way entry and exit points available for Dawson Drive. | In Progress |
| Eastbound Highway 1 on- and off-ramps at Chestermere Boulevard | July 10 2026 - November 30, 2026 | Ramp and median widening work associated with Clearwater Park Phase 1 is ongoing. Motorists should expect lane restrictions, reduced speeds and changes to traffic patterns. Construction has been extended to November 30, 2026, due to material delays. | In Progress |
| Chestermere Boulevard, east of East Chestermere Drive | June 1 2026 - November 30, 2026 | The eastbound right lane remains closed for retaining wall construction. Work has been extended to November 30, 2026, due to material delays. | In Progress |
| Waterstone common (North of waterstone way & south of waterstone park) | October 26th , 2026, at 7:00 a.m. to November 1st , 2026, at 7:00 p.m. | Underground Utility repair | Completed |
