Road Closures

LocationDate(s)DetailsStatus
Waterford Boulevard at Rainbow Road Aug. 27, 2026 - Sept. 11, 2026 Full road closure for critical stormwater infrastructure improvements. Upcoming
Rainbow Road South between Waterford Boulevard and South Shore Drive (Bridge Area) Aug. 20, 2026 - Sept. 4, 2026 Full road closure for critical stormwater infrastructure improvements. Crews will excavate a trench across the roadway to install underground infrastructure. The road will be impassable to all vehicles. Follow posted detours and allow additional travel time. Additional impacts include pathway closures and periodic lane restrictions in the surrounding area. In Progress
Chestermere Boulevard from Range Road 284 to Rainbow Road S August 7, 2026 - November 30, 2026 UPDATE - AUGUST 20: Eastbound drivers on Chestermere Boulevard will no longer be able to turn left onto Rainbow Road North. The advanced left-turn signal will be turned off, and "No Left Turn" signage will be posted. This temporary change is being made to help reduce traffic backups at the intersection while work continues. Phase 2. Chestermere Boulevard expansion underground and surface works. The speed will be reduced to 50 km/hr and traffic control will be in place. One way entrance to Merganser Drive available (no exit). Two-way entry and exit points available for Dawson Drive. In Progress
Chestermere Boulevard from Range Road 284 to Rainbow Road S August 5 - 7, 2026 Phase 1. Chestermere Boulevard expansion underground and surface works. The speed will be reduced to 50 km/hr and traffic control will be in place. Merganser Drive and Dawson Drive entrance and exits will be open. In Progress
Chestermere Boulevard at the Highway 1 interchange July 10, 2026 - October 15, 2026 (tentative) Temporary eastbound lane closures and traffic shifts on Chestermere Boulevard near the Highway 1 interchange for off-ramp improvements and median widening. Expect reduced speeds and minor delays. In Progress
Dawson Way between Dawson Wharf Mount and Dawson Circle August 20, 2026 - August 29, 2026 Full road closure for utility excavation and repair work. In Progress
Dawson Wharf Mount and Dawson Dock Avenue (Dawson Landing Phase 4) July 24, 2026 - August 21, 2026 Site service repair work in Dawson Landing Phase 4. In Progress
Chestermere Boulevard Eastbound June 15, 2026 - October 5 (tentative) Right lane closure on the eastbound lane between East of East Chestermere Drive and just west of the Community Operations area for the construction of a retaining wall. In Progress
TWP 240 between RR 284 & Waterbury Road 7:00am July 1, 2026 - 7:00pm July 24, 2026 Temporary Lane Closure - Surface works Completed